一二三四在线观看免费视频-成人免费无码大片a毛片软件-国产又色又爽又黄刺激视频-久久久久88色偷偷

Technical document

Injection molding process of ABS material

2024-01-07 21:31:37 Injection molding process

ABS (acrylonitrile-butadiene-styrene copolymer) is a common thermoplastic polymer that is widely used in injection molding to produce a variety of plastic parts and products. ABS plastics are known for their good mechanical properties, comprehensive 

stability and ease of processing. Here are some key steps and considerations for the injection molding process of ABS materials:

Equipment selection: Because ABS has good fluidity, it is suitable for using standard injection molding machine for processing. Machine selection should consider the size of the product, wall thickness and injection volume.

Drying: ABS materials must be dried before processing to remove moisture from the material. The general recommended drying conditions are to dry ABS particles in an environment of 80-85°C for 2-4 hours.

injection mould

Melt temperature: The melt temperature range of ABS is usually 210°C to 280°C, and the specific temperature needs to be 

adjusted according to the characteristics of the material and product design. Too high a temperature may cause material 

degradation, while too low a temperature may affect fluidity and product quality.

Mold temperature: The temperature of the mold is usually controlled between 40°C and 80°C to ensure a good product surface finish and reduce internal stress. Mold design and cooling system can also affect this parameter.

Injection pressure: The appropriate injection pressure should be determined according to the design characteristics of the product. In general, the injection pressure of ABS material can range from 50MPa to 100MPa. An inadequate pressure setting may result in inadequate melt filling, while too high a pressure may cause back expansion or warping.

Pressure holding stage: Pressure holding is a stage after injection to ensure that sufficient pressure can be maintained in the cavity to supplement the shrinkage of the melt during the mold cooling and curing process. The setting of the holding time and pressure directly affects the dimensional stability and surface quality of the product.

Cooling time: Sufficient cooling time contributes to full curing and dimensional stability of the product. The length of time depends on a variety of factors, including wall thickness, mold temperature, and product design.

Screw back pressure: Proper screw back pressure can help improve the quality and mixing effect of the melt, while avoiding air mixing. But too high back pressure will increase the wear and energy consumption of the machine.

Stripping and post-treatment: The finished product needs to be removed from the mold, which may require an appropriate stripping mechanism. Some products may also require post-processing steps such as deburring, painting, or coating.

Note that the above parameters may be adjusted according to the specific machine, material, product design and processing environment. Experienced injection molding engineers usually fine-tune according to the actual situation to ensure product quality. When performing ABS injection molding, it is important to follow the specific instructions and data sheets provided by the material supplier, as well as safety procedures and operating guidelines.

injection mould


Home
Product
News
Contact
主站蜘蛛池模板: 亚洲人成欧美中文字幕| 国产精品乱码一区二区三区| 全部免费毛片在线播放| 亚洲精品v天堂中文字幕| 人妻人人做人碰人人添| 毛片在线播放a| 精品国产精品国产偷麻豆| 亚洲熟女乱综合一区二区| 无限看片在线版免费视频大全| 老司机在线精品视频网站| 国产成人无码av在线播放无广告| 亚洲 欧洲 日韩 综合二区| 国产无遮挡又黄又爽在线观看| 大地资源中文第三页| 国产欧美日韩专区发布| 一本一道精品欧美中文字幕| 久久久中文久久久无码| 99久久超碰中文字幕伊人| 中文字幕人妻av一区二区| 成人免费国产精品视频| 亚洲熟妇av午夜无码不卡| 亚洲乱亚洲乱妇无码| 日本55丰满熟妇厨房伦| 强奷乱码中文字幕熟女导航| 久久无码精品一区二区三区| 精品一区国产vr| 国产精品va在线播放我和闺蜜| 久久黄色视频| 蜜臀av免费一区二区三区| 国产精品一区二区久久国产| 久久精品国产精品| 亚洲日韩精品无码一区二区三区| 高清freexxxx性国产| 奇米影视7777久久精品| 最近中文字幕完整在线看一| 国产无遮挡又黄又爽在线视频| 亚洲综合色成在线播放| 欧美日韩不卡合集视频| 久久青青草原亚洲av无码| 野外做受三级视频| 免费人成自慰网站|